Hi,Diagram below is my current configuration for 100Ds (soon will be
replace with 80Fs). Right now my dell L2 switch (D1) is connected to
Interface 1 with 3 VLAN. I'm going to add a cisco switch just in case if
that D1 fails, I'm thinking to do Hardw...
I'm running 6.2.12, so there is no option for migrate.I tried with 7.0.9
on GNS3:1. Create AggPort and assigned different subnet2. Backup3.
Remove configuration from port1, copy the ip address to AggPort (i tried
to put on the first line after system...
I test using GNS3, using 2 Channel-group:A0/1,B0/1 channel-group 1 mode
active, connected to FGT1 (port 5,6)A0/2,B0/1 channel-group 2 mode
active, connected to FGT2 (port 5,6)with lacp-ha-slave disable,
following this
https://docs.fortinet.com/docume...
Thanks Graham,D1, C1 are edge switches I still have 2 others that
connected to both D2.I inherited this topology, I thought D2 stack are
connected to FG since HCI connect to that stack.So what is prefer
configuration for FG if i connect D2s to FG?