Skip to main content
munk
New Member
Jan 31, 2019 5:09 PM UTC
Solved

FortiClient does not work with D-Link GO-RT-AC750 router

I have got FortiClient to connect to my enterprise VPN, but I can not connect through my router. The error message is: VPN has "trouble connecting with the remote gateway, retrying now..." The connection through a mobile phone net is successful. Are there any settings, I should do on the router?

Thanks

    SteveG
    SteveGAnswer
    New Member
    Feb 1, 2019 12:23 PM UTC

    I'd expect SPI would need to be enabled for the ALG settings to work. If you're still having problems I'd do two things next.

     

    1, Take a look at the VPN logs on the FortiGate that's terminating the VPN as that often gives a pointer.

    2, run a Diag sniff packet any 'host x.x.x.x' on the Fortigate (replace the x.x.x.x with the public IP of the D-Link). You should see the IPSec phase 1 traffic (UDP 500/4500) then the actual encrypted payload (phase 2 - protocol 50). If you don't see protocol 50 arriving on the FG then the D-Link is dropping it.

    4 replies

    SteveG
    New Member
    Feb 1, 2019 8:31 AM UTC

    You normally need to enable IPSec support on routers. Have you enabled IPSec ALG (page 85 in the manual).

     

    https://eu.dlink.com/cz/c...b1_manual_v2_00_eu.pdf

    Translate
    munk
    munkAuthor
    New Member
    Feb 1, 2019 12:11 PM UTC

    Dear Steve,

    thanks for the reply, but the IPSec is enabled, and the connection fails. Any other suggestions?

    Sandor Munk

    Translate
    SteveG
    SteveGAnswer
    New Member
    Feb 1, 2019 12:23 PM UTC

    I'd expect SPI would need to be enabled for the ALG settings to work. If you're still having problems I'd do two things next.

     

    1, Take a look at the VPN logs on the FortiGate that's terminating the VPN as that often gives a pointer.

    2, run a Diag sniff packet any 'host x.x.x.x' on the Fortigate (replace the x.x.x.x with the public IP of the D-Link). You should see the IPSec phase 1 traffic (UDP 500/4500) then the actual encrypted payload (phase 2 - protocol 50). If you don't see protocol 50 arriving on the FG then the D-Link is dropping it.

    Translate
    Risk and Resilience in the Age of AI. An OT Thought Leadership Summit for Houston's Critical Infrastructure Leaders. Date: Thursday, December 3, 2026. Time: 8:30 am - 1:30 pm (CT). Location: The Westin Houston, Memorial City | 945 Gessner Road, Houston, TX 77024